Partner case: should Minesaka Railway replace its branch line with buses?
Worked case with 11 questions and 2 exhibits
Case
Minesaka Railway is a private railway company in Japan. Its main line is profitable, but a 40 km rural branch line loses money every year as the valley's population ages and shrinks. The CEO asks whether to close the branch line and replace it with buses. The partner says: "What would you tell the CEO, and how would you handle the prefecture?"
Partner-led: a judgment case with public-interest issues. A little math anchors the answer; most of the time goes on stakeholders and pushback.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does Minesaka Railway run?
What the interviewer says
A profitable main line and a 40 km rural branch line up a valley whose population is aging and shrinking.
History
How has use of the branch line changed?
What the interviewer says
Trips have fallen from about 2,500 a day in 2000 to about 1,000 a day today.
Objective
What does the CEO want from us?
What the interviewer says
A view on replacing the line with buses, and how to handle the prefecture.
Financials
What does the line cost to run, and who helps pay?
What the interviewer says
About JPY 876 million a year, including staff, trains and track upkeep. The prefecture pays a subsidy of JPY 300 million a year toward the loss.
What would a replacement bus service cost?
What the interviewer says
About JPY 250 million a year. The team expects about 20 percent of riders to stop using public transport if the train goes.
Market
Anything else under discussion for the line?
What the interviewer says
A tourist sightseeing train was suggested last year, and staff are getting new uniforms.
Customers
How many people use the branch line, and what do they pay?
What the interviewer says
About 1,000 trips a day, every day of the year, at an average fare of JPY 400.
Who are the riders?
What the interviewer says
Mostly older residents going to the hospital and shops, and high school students.
Competitors
How else do people travel up the valley?
What the interviewer says
By car, for those who still drive. There is no other public transport.
Operations
Is any big spending coming?
What the interviewer says
A bridge on the line needs about JPY 3 billion of repairs within five years. About 45 staff work on the line.
Constraints
Does the company need the prefecture for anything else?
What the interviewer says
Yes. The prefecture supports its station redevelopment projects on the main line.
Exhibits
Exhibit 1
Bar chart: Minesaka branch: yearly loss under each option (JPY million). Values in JPY million a year. Rail, before subsidy: 730; Rail, after the JPY 300 million subsidy: 430; Bus service, before subsidy: 133.2.
Fictional company.
Exhibit 2
| Option | Trips a year | Cost per trip | Fare | Loss per trip |
|---|---|---|---|---|
| Train | 365,000 | 2,400 | 400 | 2,000 |
| Bus | 292,000 | 856.16 | 400 | 456.16 |
Fictional company. The bus case assumes 20 percent fewer trips.
Solution
Show the solutionHide the solution
Hypothesis
Rural lines with this few riders rarely cover their costs, so my hypothesis is that a bus service is far cheaper, and that the harder part of the answer is how to make the change with the prefecture and the towns, not whether the numbers work.
Structure
- Keep the line, replace it, or change it?This comes from saving = the line's yearly loss minus the bus service's yearly loss, weighed against what each stakeholder gains or loses.
- Economics today: loss per year and per trip
- The bus option and the saving
- Key: Stakeholders: prefecture, towns, riders, staff
- How and when to make the change
Analysis
1. Trips a year
Candidate: "About 1,000 trips a day for 365 days gives:"
Trips a year: 1,000 × 365 = 365,000
2. The rail loss
Candidate: "Fare income is about JPY 146 million a year against JPY 876 million of cost, so before subsidy the line loses:"
Annual rail loss before subsidy (JPY): 876,000,000 - 365,000 × 400 = 730,000,000
3. Loss per trip
Candidate: "Each trip costs about JPY 2,400 to provide and earns JPY 400, so every trip loses about JPY 2,000."
Loss per trip (JPY): (876,000,000 - 365,000 × 400) ÷ 365,000 = 2,000
4. The bus option
Candidate: "Buses cost about JPY 250 million a year. If 20 percent of riders stop traveling, fare income falls to about JPY 117 million, so the bus service loses:"
Annual bus loss (JPY): 250,000,000 - 365,000 × 0.8 × 400 = 133,200,000
5. The saving
Candidate: "Switching saves about JPY 597 million a year. And the JPY 3 billion bridge repair equals about five years of that saving, so waiting makes the choice harder, not easier."
Annual saving from switching (JPY): (876,000,000 - 365,000 × 400) - (250,000,000 - 365,000 × 0.8 × 400) = 596,800,000
6. The bridge in years of saving
Candidate: "The JPY 3 billion bridge repair, divided by the yearly saving:"
Bridge repair in years of saving: 3,000,000,000 ÷ ((876,000,000 - 365,000 × 400) - (250,000,000 - 365,000 × 0.8 × 400)) = 5.03
7. Pushback 1: the prefecture
Partner: "The governor will be furious, and we need the prefecture for our station redevelopment projects on the main line." Candidate: "That is a real cost I had left out, and it changes how we do this, not whether. I would not announce a closure. I would take the numbers to the prefecture privately with a joint plan. Its JPY 300 million subsidy covers well under half of the loss today; the company still carries about JPY 430 million a year. A bus network would cost less than the subsidy alone, so the prefecture's money could buy a better service."
Loss the company carries after the subsidy (JPY a year): 876,000,000 - 365,000 × 400 - 300,000,000 = 430,000,000
8. Pushback 2: the riders
Partner: "Buses are slower, and many riders are elderly." Candidate: "Agreed, so the plan must answer that directly: low-floor buses, more departures than the train has today, which the saving easily pays for, and stops closer to homes than the stations are. In the upper valley I would test small on-demand buses. If ridership falls much more than 20 percent in the first year, we should revisit the design."
- Exhibit 1: Even before subsidy, a bus service loses far less than the train does after it.
- Exhibit 2: A bus trip costs about a third of a train trip to provide.
Recommendation
Recommend replacing the branch line with a bus service, agreed with the prefecture rather than announced to it. First, the line loses about JPY 730 million a year before subsidy, about JPY 2,000 per trip, while a bus service would lose about JPY 133 million, saving about JPY 597 million a year. Second, the JPY 3 billion bridge repair equals about five years of that saving, so delay makes the choice more expensive. Third, the prefecture's JPY 300 million subsidy alone is more than the bus network's JPY 250 million running cost, leaving money for more departures than today's trains, so riders can gain frequency even as they lose the train. The main risks are the relationship with the prefecture and access for older riders. Next steps: share the numbers privately with the prefecture, design the bus network with the towns, and set a transition date before the bridge work must start.
Risks
- The prefecture may block or delay the change, which would affect other projects with the company
- More than 20 percent of riders may stop traveling, especially older people
- Local media may frame the change as abandoning the valley
Next steps
- Meet the prefecture privately with the numbers and a draft joint plan
- Design routes and timetables with the towns and a group of regular riders
- Plan redeployment for the line's staff to the main line or the bus service
Strong and weak answers
A strong candidate
Anchored the answer with three quick numbers (loss per trip, the saving, the bridge), then spent most of the time on the prefecture and the riders. Treated the governor pushback as a fact that changes the plan, not the answer, and turned the subsidy into part of the solution.
A weak candidate
Recommended closing the line on the numbers alone and had no answer when the partner raised the governor, or dropped the recommendation entirely at the first sign of political difficulty.
Sources