Where a bread line in Cairo loses its minutes
Worked case with 14 questions and 2 exhibits
Case
A bread line at a bakery in Cairo, Egypt is planned to run 600 minutes a day. At full speed it bakes 2 trays a minute (0.5 minutes a tray). Yesterday it stopped for 60 minutes (a breakdown and a change of recipe), baked 900 trays and threw away 60 burnt or broken ones. The owner is thinking about a second oven to meet new orders. What is its OEE, and where do the minutes go? (Fictional bakery, illustrative figures.)
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does the line make, and for whom?
What the interviewer says
Flat bread and rolls, sold by the tray to 40 shops, cafes and two hotels in Cairo. Bread is baked and delivered the same day.
History
Has anyone measured the line before?
What the interviewer says
No. It was installed 6 years ago, and the owner tracks only trays baked each day.
Objective
Why does the owner care now?
What the interviewer says
A hotel group wants 160 more good trays a day from next quarter. That would take the line to 1,000 good trays a day.
Financials
What is a good tray worth?
What the interviewer says
Each good tray earns about EGP 150 of contribution. A burnt or broken tray earns nothing, and its dough is lost.
What would a second oven cost?
What the interviewer says
A second oven line costs about EGP 4 million installed. It needs 3 more staff on each shift.
Market
Is demand for bread growing?
What the interviewer says
Orders from shops are flat. Orders from hotels and cafes grow about 10 percent a year.
Customers
What do the hotels care about?
What the interviewer says
Delivery before 6 in the morning and even browning. They send back trays that look burnt.
Competitors
Who else could supply the hotels?
What the interviewer says
Two industrial bakeries in Giza. One of them installed a new oven line last year.
Operations
What were the 60 minutes of stops?
What the interviewer says
40 minutes when the oven conveyor jammed, and 20 minutes to change from bread to rolls.
How fast did the line actually run?
What the interviewer says
It is designed for 2 trays a minute. Yesterday it baked 900 trays in 540 running minutes.
Why were trays thrown away?
What the interviewer says
45 trays were burnt in the oven and 15 broke when they were unloaded.
Has anything changed in the ingredients?
What the interviewer says
The bakery changed flour supplier last month. Flour now costs 10 percent more.
Constraints
Can the line run longer than 600 minutes?
What the interviewer says
No. The rest of the day goes to cleaning, maintenance and staff rest.
Is there room for a second oven?
What the interviewer says
Only by giving up the flour store. Installing it would take about 4 months.
Exhibits
Exhibit 1
Waterfall chart: From planned minutes to good minutes on the bread line (minutes). Values in minutes. Planned minutes, total: 600; Stops, change: -60; Slow running, change: -90; Defects, change: -30; Good minutes, total: 420.
Source: illustrative.
Exhibit 2
Bar chart: Minutes lost yesterday by cause (minutes). Values in minutes. Conveyor jam: 40; Recipe change: 20; Slow running: 90; Burnt trays: 22.5; Broken trays: 7.5.
Source: illustrative shift log.
Solution
Show the solutionHide the solution
Structure
- OEE = good minutes / planned minutes
- Stops: planned minutes minus running minutes
- Key: Slow running: running minutes minus the minutes the trays should have taken
- Defects: minutes spent on trays that were thrown away
Analysis
1. Running minutes
Planned 600 minus 60 minutes of stops.
Running minutes: 600 - 60 = 540
2. Minutes the trays should take
900 trays at the ideal 0.5 minutes each.
Ideal minutes for 900 trays: 900 × 0.5 = 450
3. Slow running
The line ran 540 minutes but did only 450 minutes of full-speed work.
Minutes lost to slow running: 540 - 900 × 0.5 = 90
4. Defects
60 thrown-away trays used 0.5 minutes each.
Minutes lost to defects: 60 × 0.5 = 30
5. Good minutes
840 good trays at 0.5 minutes each.
Good minutes: (900 - 60) × 0.5 = 420
6. OEE
Good minutes divided by planned minutes.
OEE (fraction): 420 ÷ 600 = 0.7
7. The same answer from the three rates
Availability 540/600, performance 450/540, quality 840/900, multiplied together.
OEE from the three rates (fraction): (540 ÷ 600) × (450 ÷ 540) × (840 ÷ 900) = 0.7
8. Good trays today
900 trays baked minus 60 thrown away.
Good trays a day: 900 - 60 = 840
9. OEE the hotel order needs
The hotel order takes the target to 1,000 good trays a day, which is 500 good minutes out of 600.
OEE needed (fraction): 1,000 × 0.5 ÷ 600 = 0.8333
10. Trays hidden in slow running
At full speed, the 90 slow minutes would bake more trays.
Extra trays from the slow minutes: 90 ÷ 0.5 = 180
11. Good trays with no slow running
Today's 840 good trays plus the 180 hidden in slow running, if those trays are all good.
Good trays a day without slow running: (900 - 60) + 90 ÷ 0.5 = 1,020
12. What the slow minutes are worth
180 trays a day at EGP 150 of contribution each.
Contribution in the slow minutes a day (EGP): 90 ÷ 0.5 × 150 = 27,000
- Exhibit 1: Slow running, not breakdowns, is the biggest loss: 90 of the 180 lost minutes.
- Exhibit 2: Slow running is one cause but loses more minutes than the jam and the recipe change together.
Recommendation
OEE is 70 percent: of 600 planned minutes, only 420 made good bread. Start with slow running, which loses 90 minutes, more than stops (60) or defects (30). Find out why the line runs below 2 trays a minute. Possible causes: dough not ready, an oven set cooler to avoid burning, or too few staff at the start of the shift. Then cut the recipe change time. Every minute won back here is extra bread with no new oven. The 90 slow minutes hide about 180 trays a day, worth about EGP 27,000. That is more than the 160 extra trays the hotel wants, so improve the line before spending EGP 4 million on a second oven. Bread cannot be baked ahead and stored, so a bakery earns its margin from oven minutes on the day. The main risk is that the line cannot really hold 2 trays a minute, so test full speed for a week first.
Risks
- The rated speed of 2 trays a minute may be too high for the current oven, so part of the slow running may not be recoverable
- Running faster may raise the number of burnt trays and eat into the gain
- If hotel orders keep growing about 10 percent a year, a second oven may still be needed later
Next steps
- Log speed, stops and thrown-away trays every shift for two weeks, split by cause
- Watch the first two hours of a shift to see why the line runs below full speed
- Plan the recipe change for a quiet hour and cut its 20 minutes with prepared trays
- Revisit the second oven only if OEE is still below 83 percent after three months
Sources
Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.