So What Club

An Indian steelmaker and the EU carbon border charge

Worked case with 11 questions and 1 exhibit

Case

An Indian steelmaker exports part of its output to the EU. Its steel, made in blast furnaces, carries about 2.5 tonnes of CO2 per tonne of steel. The EU carbon border charge is phasing in, and EU buyers have started asking who will pay it. The managing director asks how exposed the company is and what it should do.

Candidate-led: you drive; the interviewer answers what you ask. All figures are illustrative.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • How big is the steelmaker, and how much goes to the EU?

    What the interviewer says

    It makes about 5 million tonnes a year in blast furnaces. About 200,000 tonnes go to the EU.

  • How is the home market doing?

    What the interviewer says

    Its sales in India grew about 8 percent last year. A new port terminal near the main plant opened this year.

History

  • How have EU sales moved?

    What the interviewer says

    They grew from 120,000 tonnes three years ago to 200,000 tonnes now.

Objective

  • What does the board want?

    What the interviewer says

    To keep selling to the EU profitably, and a decision on any new furnace this year.

Financials

  • What do EU sales earn?

    What the interviewer says

    EUR 600 per tonne, with a margin of about 10 percent.

Market

  • How does the charge work?

    What the interviewer says

    Under Regulation (EU) 2023/956, importers pay for the CO2 embedded in steel. Assume EUR 80 per tonne of CO2 at full phase-in, due in 2034, with no carbon price paid in India.

Customers

  • Who pays in practice?

    What the interviewer says

    The EU importer pays, but expects the exporter to share the cost through lower prices. Buyers would pay about EUR 30 per tonne more for low-carbon steel.

Competitors

  • What are other exporters doing?

    What the interviewer says

    Several exporters to the EU from other countries are building scrap-based furnaces.

Operations

  • Is there a lower-carbon way to make the EU volume?

    What the interviewer says

    An electric arc furnace using scrap would emit about 0.6 tonnes of CO2 per tonne of steel. It would cost about EUR 150 million.

  • Is scrap available?

    What the interviewer says

    Partly. About 30 percent of the scrap would need to be imported.

Constraints

  • How long would a new furnace take?

    What the interviewer says

    About three years from approval to full output.

Exhibit

Exhibit 1

CO2 embedded in one tonne of steel, by route (tonnes)(tonnes of CO2 per tonne of steel)

Bar chart: CO2 embedded in one tonne of steel, by route (tonnes). Values in tonnes of CO2 per tonne of steel. Blast furnace today: 2.5; Electric arc furnace with scrap: 0.6.

The company's estimates for its own plants. Source: illustrative figures for teaching.

Solution

Show the solution

Hypothesis

Steel made in blast furnaces carries a lot of carbon. My hypothesis is that the border charge, once fully phased in, would be larger than the whole margin on EU exports, so the company must either cut emissions on that steel or sell it elsewhere.

Structure

  • Size the charge, compare with margin, and test the optionsThis comes from charge = tonnes sold to the EU x CO2 per tonne x carbon price, compared with the margin on those sales.
    • Charge per tonne and in total
    • Key: Charge versus margin on EU sales
    • Options: cut emissions, pass on cost, sell elsewhere

Analysis

  1. 1. Charge per tonne of steel

    Candidate: "At full phase-in the charge applies to all 2.5 tonnes of embedded CO2, at EUR 80 each:"

    Charge (EUR per tonne of steel): 2.5 × 80 = 200

  2. 2. Total yearly charge

    200,000 tonnes exported to the EU.

    Charge (EUR a year): 200,000 × 2.5 × 80 = 40,000,000

  3. 3. Compare with margin

    Candidate: "What do we earn on EU sales today?" Interviewer: "About 10 percent of EUR 600 per tonne." The charge is more than three times the whole margin.

    Margin on EU sales (EUR a year): 200,000 × 600 × 0.1 = 12,000,000

  4. 4. Option: lower-carbon route

    Candidate: "Is there a lower-carbon way to make the EU volume?" Interviewer: "An electric arc furnace using scrap would emit about 0.6 tonnes per tonne of steel and cost EUR 150 million." Candidate: "It would still pay the charge on 0.6 tonnes, EUR 48 per tonne of steel:"

    Remaining charge (EUR a year): 200,000 × 0.6 × 80 = 9,600,000

  5. 5. Yearly benefit

    Interviewer: "EU buyers would also pay about EUR 30 per tonne more for low-carbon steel." The charge saved plus the premium:

    Yearly benefit (EUR): 200,000 × (2.5 - 0.6) × 80 + 200,000 × 30 = 36,400,000

  6. 6. Payback

    Investment divided by the yearly benefit.

    Payback (years): 150,000,000 ÷ 36,400,000 = 4.12

  7. 7. Charge as a share of the price

    How much of the EUR 600 price the charge would eat if the exporter absorbed it all.

    Charge as a share of price (percent): 200 ÷ 600 × 100 = 33.33

  • The exhibit: The scrap route cuts embedded CO2, and so the border charge, by about three quarters.

Recommendation

I recommend that the steelmaker plan now for a lower-carbon route for EU sales. First, once fully phased in, the border charge of about EUR 40 million a year would be more than three times the EUR 12 million margin on EU exports. Second, a scrap-based electric arc furnace cuts the charge to about EUR 9.6 million and earns a green premium. That is a benefit of about EUR 36.4 million a year, with a payback of about 4.1 years. Third, the charge phases in until 2034, but steel this carbon-heavy pays on its emissions above the EU benchmark from the start. So the time to build is shorter than the end date suggests. Steel is a commodity with thin margins, so a charge worth a third of the price cannot be passed on or absorbed. Investing in a lower-carbon route is both a decarbonization move and a way to keep the EU market. Model the charge year by year.

Risks

  • Border-charge rules, deductions, and the phase-in schedule may change
  • Scrap supply and electricity prices affect the new furnace's cost
  • EU buyers may not pay the full green premium
  • Rival exporters building their own low-carbon furnaces may erode the premium

Next steps

  • Model the charge year by year under the current phase-in schedule
  • Secure scrap supply and a power contract for the new furnace
  • Talk to the top EU buyers about low-carbon steel contracts
  • Set up measurement and checks of embedded emissions, which EU importers must report

Strong and weak answers

A strong candidate

Sized the charge, compared it with margin, and tested a lower-carbon option with payback and phase-in timing.

A weak candidate

Said the charge "is the importer's problem" and ignored that it would be passed back through price.

Sources
Facts checked against sources on

Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.