So What Club

Unit economics of a copper mine

Worked case with 10 questions and 1 exhibit

Case

Ridgecrest Copper (a fictional company) runs an open-pit mine in Chile, processing 25 million tonnes of ore a year at 0.8 percent copper with 90 percent recovery. Mining and processing cost USD 24 per tonne of ore, and transport, smelting charges and site overheads add USD 210 million a year. The copper price used for planning is USD 9,500 per tonne. The ore grade is falling, and the board asks for the cash cost per tonne of copper and the yearly cash margin.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • Is this Ridgecrest's only mine?

    What the interviewer says

    Yes. It opened in 2008 in the Atacama region and is the company's only asset.

  • How many people work at the mine?

    What the interviewer says

    About 1,500 workers live in the mine camp, which opened a new canteen last year.

History

  • How has the grade changed?

    What the interviewer says

    It fell from 1.1 percent copper at opening to 0.8 percent today. The mine plan shows 0.7 percent within three years.

Objective

  • What does the board want?

    What the interviewer says

    To keep cash cost below USD 5,000 per tonne of copper, which its analysts see as the middle of the industry cost curve.

Financials

  • What is not in the cash cost?

    What the interviewer says

    Royalties, income taxes and about USD 150 million a year of sustaining capex.

Market

  • Why use USD 9,500 for copper?

    What the interviewer says

    It is the board's long-term planning price. Recent market prices have been higher.

Customers

  • Who buys the copper?

    What the interviewer says

    Smelters in Asia buy the copper concentrate under yearly contracts.

Competitors

  • How do nearby mines compare?

    What the interviewer says

    Neighbouring mines have grades between 0.5 and 1.2 percent.

Operations

  • Where does the water come from?

    What the interviewer says

    Desalinated sea water pumped 150 km inland. It costs about USD 2 of the USD 24 per tonne of ore.

Constraints

  • Can the mine process more ore?

    What the interviewer says

    An expansion to 30 million tonnes a year needs a new permit, which takes about three years, including consultation with local communities.

Exhibit

Exhibit 1

The mine at two ore grades (illustrative)(tonnes of copper; USD)
The mine at two ore grades (illustrative)
Ore grade (percent)Copper produced (tonnes)Cash cost (USD per tonne)Yearly cash margin (USD million)
0.8180,0004,500900
0.7157,5005,143686.25

Solution

Show the solution

Structure

  • Cash margin = copper produced x (price minus cash cost per tonne)
    • Copper produced = ore x grade x recovery
    • Total cash cost = ore x cost per tonne of ore + other costs
    • Cash cost per tonne = total cash cost divided by copper produced
    • Key: What a lower grade does to all three

Analysis

  1. 1. Copper produced

    25 million tonnes of ore, 0.8 percent copper, 90 percent recovered.

    Copper produced (tonnes): 25,000,000 × 0.008 × 0.9 = 180,000

  2. 2. Total cash cost

    USD 24 on 25 million tonnes is 600 million, plus 210 million.

    Total cash cost (USD million): 25 × 24 + 210 = 810

  3. 3. Cash cost per tonne

    USD 810 million divided by 180,000 tonnes.

    Cash cost (USD per tonne of copper): 810,000,000 ÷ 180,000 = 4,500

  4. 4. Yearly cash margin

    Margin of 5,000 dollars per tonne on 180,000 tonnes.

    Yearly cash margin (USD million): (9,500 - 4,500) × 180,000 ÷ 1,000,000 = 900

  5. 5. Copper at a 0.7 percent grade

    Mining is a cost curve business: costs are paid per tonne of rock, revenue per tonne of metal. The mine plan shows grade falling to 0.7 percent within three years.

    Copper produced at 0.7 percent (tonnes): 25,000,000 × 0.007 × 0.9 = 157,500

  6. 6. Cash cost at 0.7 percent

    The same USD 810 million spread over fewer tonnes.

    Cash cost at 0.7 percent (USD per tonne of copper): 810,000,000 ÷ 157,500 = 5,143

  7. 7. Margin at 0.7 percent

    Revenue on 157,500 tonnes at USD 9,500, minus USD 810 million.

    Yearly cash margin at 0.7 percent (USD million): (9,500 × 157,500 - 810,000,000) ÷ 1,000,000 = 686

  • The exhibit: A tenth of a percentage point of grade costs over USD 200 million a year.

Recommendation

Ridgecrest should keep the mine running and protect its grade. It produces 180,000 tonnes of copper at a cash cost of USD 4,500 per tonne, earning about USD 900 million a year at USD 9,500. The margin of USD 5,000 per tonne gives a large cushion against a lower price. But cost per tonne of copper depends on grade, since mining cost is paid per tonne of ore. At 0.7 percent, output falls to 157,500 tonnes and cash cost rises to about USD 5,143, above the board's USD 5,000 line. The margin drops by about USD 214 million.

Risks

  • Grade may fall faster than the mine plan shows.
  • Water and energy costs in the desert can rise, adding to the USD 24 per tonne of ore.
  • Smelter charges for processing concentrate change every year.

Next steps

  • Add royalties, taxes and sustaining capex before any investment decision.
  • Test blending higher-grade ore from the pit edge to slow the fall in grade.
  • Study the expansion to 30 million tonnes of ore to spread overheads, given the three-year permit time.
Sources
Facts checked against sources on

Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.