Case

A fictional family-owned pump maker in Germany makes 100,000 valve bodies a year, and its CFO wants to cut costs. Its variable cost is EUR 40 per part (materials, direct labor, energy). The accounting system also allocates EUR 25 per part of factory overhead, which would not go away if production stopped. A supplier in Poland offers EUR 55 per part, and the CFO asks whether to buy.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • What role does the valve body play?

    What the interviewer says

    It is a core part of the company's industrial pumps, which are sold mainly to chemical plants.

  • Has the plant invested recently?

    What the interviewer says

    It installed solar panels on the roof last year.

History

  • How long has it been made in-house?

    What the interviewer says

    For about 30 years. The scrap rate is about 2 percent.

Objective

  • What does the CFO want?

    What the interviewer says

    To cut costs by about EUR 1 million a year.

Financials

  • What is in the EUR 25 of overhead?

    What the interviewer says

    Building costs, supervisors, maintenance staff and IT. About EUR 10 per part is floor space that could be rented out.

Market

  • How reliable is the Polish supplier?

    What the interviewer says

    Its defect rate is about 1.5 percent, and trucks reach the plant in two days.

Customers

  • What do customers care about?

    What the interviewer says

    Reliability. A failed valve can stop a chemical plant for days.

Competitors

  • What do rivals do?

    What the interviewer says

    Two rivals already buy valve bodies from Eastern Europe.

Operations

  • What else could the machines make?

    What the interviewer says

    Pump housings for a new customer: about 60,000 a year at EUR 20 of contribution each.

Constraints

  • What happens to the operators if production stops?

    What the interviewer says

    The 12 operators would move to open jobs elsewhere in the plant. No one would be laid off.

Exhibit

Exhibit 1

Make or buy: yearly cost of each option (EUR, illustrative)(EUR per year, 100,000 parts)
Make or buy: yearly cost of each option (EUR, illustrative)
OptionCost that changes (EUR per part)Yearly cost (EUR)
Make in-house404,000,000
Buy from Poland555,500,000
Buy, and rent out the freed space454,500,000

Solution

Show the solution

Structure

  • Compare the supplier price with the costs that would really be saved
    • Relevant cost of making = variable cost only (overhead stays)
    • Yearly difference = (supplier price minus relevant cost) x volume
    • Then: strategy, quality, risk, other uses of the capacity

Analysis

  1. 1. Full cost on paper

    Variable 40 plus allocated overhead 25.

    Full cost per part (EUR): 40 + 25 = 65

  2. 2. Extra cost of buying

    The supplier charges 55, but only 40 of cost disappears.

    Extra cost of buying per year (EUR): (55 - 40) × 100,000 = 1,500,000

  3. 3. If some overhead can go

    This is a make or buy decision, so count only costs that truly change. Renting out the freed floor space would remove about EUR 10 of overhead per part.

    Extra cost of buying with EUR 10 of overhead removed (EUR): (55 - 40 - 10) × 100,000 = 500,000

  4. 4. Using the freed machines

    The machines could instead make 60,000 pump housings a year for a new customer, at EUR 20 of contribution each.

    Contribution from the freed capacity (EUR): 60,000 × 20 = 1,200,000

  • The exhibit: Making stays cheapest even when some overhead can be removed.

Recommendation

The pump maker should keep making the valve body, because buying would cost EUR 1.5 million more a year. The EUR 25 of overhead per part stays whether or not production stops, so the real comparison is EUR 55 against the EUR 40 variable cost. The EUR 65 full cost makes buying look cheaper than it is. Even the best use of the freed machines earns EUR 1.2 million, less than the EUR 1.5 million extra. Renting out the space instead still leaves buying EUR 0.5 million a year dearer, and the two cannot be combined, since the machines stand on that floor space. The valve body is also critical to pump reliability, which customers value most.

Risks

  • Ignoring other uses of the capacity: a better-paying order would change the answer.
  • Energy and wage rises in Germany may lift the EUR 40 variable cost over time.
  • Keeping the work in-house means the old machines must be replaced at some point.

Next steps

  • Check whether the freed capacity could earn more than EUR 1.5 million a year.
  • Find out whether any of the EUR 25 of overhead could truly be removed.
  • Use the Polish offer to benchmark and cut the in-house variable cost.