A Malaysian electronics contract manufacturer is considering moving production to Vietnam. The exhibit compares cost per unit. Should it move, and how much?

Difficulty: Standard. Format: interviewer-led, with an exhibit. Industry: Industrials and supply chain. Region: Malaysia and Vietnam. Interview length: about 30 minutes. The company is fictional and all figures are illustrative.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • What does the company make, and where?

    What the interviewer says

    Circuit boards and small assemblies for consumer electronics, in one plant in Penang with about 1,500 workers.

History

  • Why look at Vietnam now?

    What the interviewer says

    Two rivals opened plants in northern Vietnam in the last three years, and the main customer has asked about it.

Objective

  • What is the goal?

    What the interviewer says

    Decide where to make the next five years of volume, keep the main customer, and protect margins.

Financials

  • How many units, and at what price?

    What the interviewer says

    About 5 million units a year, sold at about USD 35 each.

  • What does a move cost?

    What the interviewer says

    About USD 12 million one time to move everything, including about USD 3 million of severance, or USD 6 million to move 40 percent.

Market

  • Is demand growing?

    What the interviewer says

    Volume has been flat at about 5 million units for two years.

Customers

  • What do customers want?

    What the interviewer says

    The main customer, a US electronics brand, buys about 60 percent of volume and wants supply from more than one country.

Competitors

  • What do rivals in Vietnam charge?

    What the interviewer says

    Similar prices, within about 2 percent of ours.

Operations

  • Can a Vietnam plant buy materials locally?

    What the interviewer says

    Not yet. Most components would be imported, which is why materials and logistics cost more there.

  • How fast are wages rising?

    What the interviewer says

    The second exhibit shows labor cost per unit over the next three years.

Constraints

  • Do US tariffs differ by country of origin?

    What the interviewer says

    They can, and they change often. For this case assume equal rates for goods from Malaysia and Vietnam (illustrative), but flag tariffs as a risk.

  • Do taxes or currency change the picture?

    What the interviewer says

    Both countries offer tax holidays for new investment; assume they cancel out. All contracts are in US dollars.

Exhibits

Exhibit 1

Cost per unit, USD (illustrative)
Cost per unit, USD (illustrative)
Cost itemMalaysiaVietnam
Labor42.5
Materials2020.5
Logistics11.8
Overhead32.7

Exhibit 2

Labor cost per unit over three years, USD (illustrative)
Labor cost per unit over three years, USD (illustrative)
YearMalaysiaVietnam
Today42.5
Year 14.122.7
Year 24.242.92
Year 34.373.15

Source: illustrative figures for practice, assuming wages rise 3 percent a year in Malaysia and 8 percent a year in Vietnam.

Solution

Show the solution

Hypothesis

Labor is cheaper in Vietnam, but materials and logistics may cost more. My hypothesis is that the saving is small and shrinking, so moving part of the volume beats moving all of it.

Structure

  • Saving per unit x units versus the cost of moving
    • Cost per unit in each country
    • Yearly saving and payback
    • Key: How the saving changes over time
    • Customer value of two-country supply

Analysis

  1. 1. Cost per unit in Malaysia

    Labor, materials, logistics, and overhead.

    Malaysia (USD per unit): 4 + 20 + 1 + 3 = 28

  2. 2. Cost per unit in Vietnam

    Cheaper labor and overhead, dearer materials and logistics.

    Vietnam (USD per unit): 2.5 + 20.5 + 1.8 + 2.7 = 27.5

  3. 3. Yearly saving

    5 million units at USD 0.50 each.

    Saving (USD a year): 5,000,000 × (28 - 27.5) = 2,500,000

  4. 4. Payback of a full move

    USD 12 million one time.

    Payback (years): 12,000,000 ÷ (5,000,000 × (28 - 27.5)) = 4.8

  5. 5. Curveball: wages grow at different speeds

    Interviewer: "Wages are rising about 8 percent a year in Vietnam and 3 percent in Malaysia." Saving per unit after three years:

    Saving per unit in year 3 (USD): 0.5 - ((4 - 2.5) - (4 × 1.03 × 1.03 × 1.03 - 2.5 × 1.08 × 1.08 × 1.08)) = 0.2216

  6. 6. Partial move with a customer premium

    Interviewer: "The customer would pay 1 percent more on units made in a second country." Moving 40 percent of volume for USD 6 million, payback on the saving plus the premium is:

    Payback of a 40 percent move (years): 6,000,000 ÷ (5,000,000 × 0.4 × 0.5 + 5,000,000 × 0.4 × 35 × 0.01) = 3.53

  7. 7. Why labor is not the main cost

    Contract manufacturing runs on thin margins and bought-in parts. Materials are this share of the Malaysian cost per unit:

    Materials share of cost (%): 20 ÷ 28 × 100 = 71.43

  • Exhibit 1: Vietnam saves USD 1.50 on labor but gives most of it back on materials and logistics, leaving a saving of USD 0.50 per unit.
  • Exhibit 2: The labor gap shrinks from USD 1.50 to about USD 1.22 per unit in three years.

Recommendation

Move about 40 percent of volume, not all of it. First, the full move saves only USD 0.50 per unit, a 4.8-year payback. Second, faster wage growth in Vietnam cuts that saving to about USD 0.22 per unit within three years, weakening the case for a full move. Third, a 40 percent move earns the saving plus a 1 percent premium for two-country supply. It pays back in about 3.5 years while keeping the Malaysian plant and its skills. Revisit a larger move only if Vietnamese suppliers lower material costs. The industry economics explain why the headline labor gap misleads. In contract manufacturing, materials are about 71 percent of cost per unit, so a workforce 37.5 percent cheaper moves total cost by under 2 percent. The real strategic move is supply diversification, a second country of production that the main customer, buying 60 percent of volume, will pay for. That is why a partial move beats both staying put and moving everything.

Risks

  • Start-up quality problems in a new plant
  • The customer premium may not last
  • US tariff rates by country of origin can change and could favor either country

Next steps

  • Agree the premium in the next customer contract
  • Find local suppliers in Vietnam to reduce material and logistics costs

Strong and weak answers

A strong candidate

Compared full cost per unit, not just labor, tested wage growth, and used the customer's need for two-country supply to shape a partial move.

A weak candidate

Saw that labor is almost 40 percent cheaper in Vietnam and recommended moving everything.