Standard: Mirrabeena Iron: keep a small iron ore mine running?

Worked case with 12 questions and 1 exhibit

Case

Mirrabeena Iron runs a small iron ore mine in Western Australia. The iron ore price has fallen, and the board asks whether it should keep the mine running or close it until prices recover. How would you approach this?

Difficulty: Standard. Format: candidate-led, with interviewer dialogue. Industry: Mining. Region: Australia (Western Australia). Interview length: about 30 minutes. The company is fictional and all figures are illustrative. Iron ore is usually priced in US dollars. All figures here are converted to Australian dollars (AUD), per tonne or per year.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • What kind of mine is it?

    What the interviewer says

    An open-pit mine in Western Australia producing lower-grade iron ore, about 58 percent iron.

History

  • How has it done in recent years?

    What the interviewer says

    It earned good cash over the last three years, when prices were around AUD 130 per tonne.

Objective

  • What does the board need to decide?

    What the interviewer says

    This quarter, whether to keep running or close until prices recover, with the aim of protecting cash.

Financials

  • How much does the mine produce, and at what cost?

    What the interviewer says

    About 10 million tonnes a year. Cash cost for mining, processing, rail and port is about AUD 85 per tonne, plus about AUD 10 per tonne of sustaining capital.

  • What price does it get, and what else is paid?

    What the interviewer says

    About AUD 110 per tonne on current forecasts, down from AUD 130. The state takes a royalty of 7.5 percent of the price (illustrative).

  • What would closing cost?

    What the interviewer says

    Care and maintenance costs about AUD 40 million a year, including severance, and restarting later about AUD 60 million. The rail and port contracts are take-or-pay: AUD 30 million a year is owed even if no ore ships.

Market

  • Why has the price fallen?

    What the interviewer says

    Assume demand from steel mills in Asia has slowed while new supply is coming. Lower-grade ore sells at a wider discount when prices fall.

Customers

  • Who buys the ore?

    What the interviewer says

    Two steel mills in Asia, on yearly contracts priced off a monthly index.

Competitors

  • How do our costs compare with other producers?

    What the interviewer says

    The exhibit shows cash cost plus sustaining capital for five producers.

Operations

  • Where could costs come down?

    What the interviewer says

    Contractors do most of the mining on rates set two years ago. Fuel is about 20 percent of cash cost.

  • Is there exploration spending?

    What the interviewer says

    A small drilling program costs AUD 5 million a year. It is outside this case.

Constraints

  • What happens to the workforce if the mine closes?

    What the interviewer says

    About 400 of the 500 workers would leave. Skilled workers are hard to hire back in the region.

Exhibit

Exhibit 1

Cash cost plus sustaining capital by producer, AUD per tonne (illustrative)(AUD per tonne)

Bar chart: Cash cost plus sustaining capital by producer, AUD per tonne (illustrative). Values in AUD per tonne. Producer A: 40; Producer B: 45; Producer C: 60; Producer D: 75; Mirrabeena: 95.

Source: illustrative figures for practice. Royalties are not included.

Solution

Show the solution

Hypothesis

At AUD 110 the mine probably still makes some cash. My hypothesis is that it should keep running, because closing has its own costs, but that a longer price fall would force it to cut costs.

Structure

  • Keep running or close: compare the cash from each option
    • Key: Cash margin per tonne: price, royalty, cash cost, sustaining capital
    • Break-even price
    • Cost of closing: care and maintenance, take-or-pay contracts, restart
    • How long prices stay low

Analysis

  1. 1. Royalty per tonne

    Candidate: "At AUD 110, the 7.5 percent royalty is:"

    Royalty (AUD per tonne): 110 × 0.075 = 8.25

  2. 2. Cash margin per tonne

    Candidate: "Price minus royalty, cash cost, and sustaining capital."

    Cash margin (AUD per tonne): 110 - 110 × 0.075 - 85 - 10 = 6.75

  3. 3. Yearly cash flow

    Candidate: "On 10 million tonnes, in AUD million:"

    Yearly cash flow (AUD million): 10 × (110 - 110 × 0.075 - 85 - 10) = 67.5

  4. 4. Break-even price

    Candidate: "The mine covers its costs when the price after royalty equals the AUD 95 of cash cost and sustaining capital."

    Break-even price (AUD per tonne): (85 + 10) ÷ (1 - 0.075) = 103

  5. 5. Curveball: two years at AUD 95

    Interviewer: "Analysts now expect AUD 95 per tonne for the next two years." Candidate: "Then each year the mine loses, in AUD million:"

    Yearly cash flow at AUD 95 (AUD million): 10 × (95 - 95 × 0.075 - 85 - 10) = -71.25

  6. 6. Two years of running at a loss

    Candidate: "Over the two years, running costs us:"

    Cash over two years if running (AUD million): 2 × 10 × (95 - 95 × 0.075 - 85 - 10) = -142

  7. 7. Two years of closing

    Candidate: "Closing is not free: two years of care and maintenance and take-or-pay payments, plus the restart."

    Cost of closing for two years (AUD million): 2 × (40 + 30) + 60 = 200

  8. 8. Cost cut that restores break-even

    Candidate: "To break even at AUD 95, costs must fall by about AUD 7 per tonne, which is this share of the AUD 85 cash cost:"

    Cash cost cut needed (%): (85 + 10 - 95 × (1 - 0.075)) ÷ 85 × 100 = 8.38

  9. 9. The real shutdown price

    Candidate: "Closing still costs AUD 70 million a year in care and maintenance and take-or-pay. Running and closing cost the same each year, before any restart cost, at this price:"

    Price where running equals closing (AUD per tonne): (10 × (85 + 10) - (40 + 30)) ÷ (10 × (1 - 0.075)) = 95.14

  • The exhibit: Mirrabeena is the highest-cost producer shown, so it is the first to lose cash when the price falls.

Recommendation

Keep the mine running and start a cost program now. First, at AUD 110 per tonne the mine still earns about AUD 7 per tonne, or about AUD 68 million a year. Its break-even price is about AUD 103. Second, even if the price falls to AUD 95 for two years, running loses about AUD 143 million over that time. Closing costs about AUD 200 million, because the take-or-pay rail and port contracts must be paid anyway and restarting is expensive. Third, cutting cash cost by about 8 percent would bring the break-even price down to about AUD 95, so the mine would not lose cash even in the downturn. Look first at contractor rates, fuel use, and the mine plan, for example mining lower-cost areas first. Commodity economics frame the decision: the mine is a price taker, and the industry cost curve shows it as the highest-cost producer, so it feels every price fall first. Only avoidable costs matter for closing. Because AUD 70 million a year continues even when closed, running and closing cost the same at about AUD 95 per tonne, before the AUD 60 million restart. That is the real shutdown price, well below the AUD 103 break-even. The strategic move is to move down the cost curve, starting with contractor rates set two years ago, rather than to mothball.

Risks

  • Prices could stay low for longer than two years
  • Cost cuts that delay maintenance can cause breakdowns later

Next steps

  • Build a cost curve for each part of the mine
  • Ask whether the rail and port contracts can be reduced or shared with a neighbor

Strong and weak answers

A strong candidate

Worked out the break-even price, then compared running and closing on cash, including the costs that do not stop when the mine stops.

A weak candidate

Said "close the mine because the price is falling," without counting the take-or-pay contracts or the restart cost.